Making Progress!

Posted by Josey McPhail on 10/2/2017

Thank you to RHS students Tristan Brown and Jared Doty for capturing this footage of the activity facility construction! The perimeter drainage around the field is currently being installed, and play clock footings have been constructed. The old goal posts have been removed as they would have been too short with the new turf going in soon. The foundation has been poured for the visitor side locker rooms and concession stand. In addition, block walls are currently being constructed for the visitor side areas as well. #makingprogress #repmoproud  

DRONE FOOTAGE: https://youtu.be/yO0dvjuvRx0

 

9.29 AF1  9.29 AF2  9.29 AF3  9.29 AF4